Friday, March 12, 2010
Eggs-cellent Planning
My group was very confident that we would be able to construct a safe housing for our egg out of the materials provided. We did a very good job of defining our goals and objectives as we knew exactly how we wanted our egg to fall and we understood what we needed to do to make a successful egg basket, or so we thought. We also did a good job of allocating our given resources and determining our status objectives as we generated a pretty thorough and detailed plan. We knew how we were going to apportion each straw and each piece of tape before we were even given any materials. One of our biggest setback's was our disregard of developing an alternative strategy; we were so confident in our initial strategy that we never even though of what to do if our egg did not look sheltered after construction. We were pretty meticulous in creating our tactical plan as we assigned roles to each group member (i.e scissor grabber, straw cutter, straw taper, dropper). Everyone in the group had a role and contributed to our final product. We did a good job of implementation in the sense of executing exactly what we planned to do. However, I believe our problem lied in the plan and strategy itself rather than the implementation, which ultimately lead to our demise. I think we should have, as a group, came up with a couple different alternatives rather than just "running" with our first option.
Subscribe to:
Post Comments (Atom)
I thought we did a good job, although the instructions we googled weren't that clear (and the construction was a bit off). I'm sure if we repeated the experiment a few more times, we'd get it right!
ReplyDeleteI think every group had this problem besides the group that was successful who happened to be sitting right next to me. I thought their idea was interesting when it was being made but I didn't think it would really work either but I turned out wrong on that. We tried to have back up ideas too but they just ending up conflicting when it actually came to implement our original idea which pushed us back farther and gave us less time to design. I think our design turned out to be one of the better ones though but it was either live or die in this case.
ReplyDeleteI still think we did EXCELLENT job! Only set back was that we did not have enough time to carefully construct our design. Our concept had all the correct elements, but with limited supplies and time, there was little we could do.
ReplyDeleteAnother positive thing in our group was, like you said, the fact that everyone knew what to do. Everyone had a job and it was all a group effort!